BOM Engineering 25 years

Sep 7, 2018

For the 25th anniversary of BOM engineering, AXIS was asked to provide a stage which was incorporated into the building of BOM engineering. Because of the limited size of the hall the construction needed to be created as slim as possible, and build around different fixed objects in the hall.

 Because of the collaboration with the other suppliers, AXIS succeeded to create the appearance of a big stage with limited space.